Project References

Currently we specialize in Public Work Projects, and have recently completed projects for many School Districts, City’s, and other Municipalities.

Schools:

  • Marin Community College, Kentfield – 2013

  • San Andreas High School, Kentfield – 2014

  • Short Elementary School, San Rafael – 2015

  • Redwood High School, Larkspur – 2015

  • Valley Vista Preschool, Petaluma- 2016

  • San Marin High School, Novato – 2016

  • Venetia Valley Elementary School, San Rafael – 2016

  • Kelseyville Elementary School, Kelseyville – 2016

  • Lu Sutton Elementary School, Novato – 2017

  • Loma Vista Immersion Academy, Petaluma- 2017

  • Old Adobe Elementary School, Petaluma- 2017

Public Work:

August 2018

Asphalt paving for Grant Elementary School

  • Reinstall AC Paving, Repair access road, re stripe, install and paint all play yard games.

  • Petaluma City Schools

  • Owner Contact - Dave Ashe 707-327-8788

  • Construction Cost - $109,000 – 30 days

May 2018

Organic Farm Parking Lot Improvements

Demo existing lot, lighting, concrete and asphalt, remove and replace below grade utilities, gas, water, storm drain, electrical, sewer. Reinstall ac, curb gutter and sidewalk, ADA pathway, stairs, rails, bio swale, new lighting, bollards, new landscaping, AC and striping.

  • Marin Community College District

  • Owner Contact - Billy Pate 408-218-8830

  • Construction Cost - $1,525,000 - 8 months

April 2009

Construct Data Center for Golden Gate Transportation District, site work, underground electrical, water, and fire suppression system, grade and prep building pad including importing and compaction, perimeter and grade beam concrete foundation, construct metal framed, 3000 sf building, insulation, sheetrock, stucco exterior, substantial HVAC, electrical and data systems.

  • For: Golden Gate Bridge Transit Department

  • Owner Contact: Jorge Lee – (415) 923-2030

  • Construction Cost: $1,352,000 – 160 Days

August 2008

Security Upgrades for Bus Transit Facility, underground utilities, fencing, automatic gates and card access system, security cameras, concrete ramps, asphalt.

  • For: Golden Gate Bridge Transit Department

  • Owner Contact: Jorge Lee – (415) 923-2030

  • Construction Cost: $590,000 – 120 Days

July 2008

Site work including underground electrical, fire suppression system, water and gas connection to City Services, foundation, asphalt, handicap access ramps, and installation of modular building.

  • For: Calistoga Unified School District

  • Owner Contact: Alexis Persinger – Persinger Architects (707) 887-0700

  • Construction Cost: $140,000 – 60 Days

October 2007

Site work including underground electrical, fire suppression system, water and gas connection to City Services, foundation, asphalt, handicap access ramps, and installation of modular building.

  • For: City of Sonoma Overnight Shelter

  • Owner Contact: Wayne Wirick (707) 938-3681

  • Construction Cost: $365,000 – 60 Days

September 2007

Site work including mound septic system, underground electrical, water, and fire suppression system, grade and prep building pad including importing and compaction, perimeter and grade beam concrete foundation, install parking area, asphalt, handicap access ramp, and install 3000sf Modular Building.

  • For: City of Sonoma Corporation Yard

  • Owner Contact: Wayne Wirick (707) 938-3681

  • Construction Cost: $640,000 – 180 Days

July 2007

Grade and prep building pad including 5.5 ft over-excavation, import and compaction of engineered fill, concrete foundation, underground electrical, water and sewer including fire suppression system for relocatable building.

  • For: Freemont Elementary School

  • Owner Contact: Neil Bohn - Counterpoint Construction Services (707) 545-8440

  • Construction Cost: $81,000 – 30 days

July 2007

Handicapped accessibility upgrades, including new 12 stall bath facilities, demo and reinstall concrete pad, various interior tenant improvements, including new fire alarm system.

  • For: Willowside Middle School

  • Owner Contact: Neil Bohn - Counterpoint Construction Services (707) 545-8440

  • Construction Cost: $359,000 - 90 days

June 2007

Interior Tenant Improvements for Nursing Lab Demo and renovate 2500 sf space to create new classrooms, framing, insulation, flooring, doors, windows, sheetrock, painting, electrical and plumbing fixtures for use as a nurse stations.

  • For: Sonoma State University

  • Contact: Project Manager Nora Hild – (707) 664-2317

  • Construction Cost: $259,000 – 45 days

May 2007

Stick Frame and Build small kitchen concession stand, including foundation, masonry exterior details and brick wainscoting, interior finishes, roofing, connection to existing sewer and water systems, underground electrical, and complete interior systems for commercial kitchen.

  • For: Santa Rosa Junior College

  • Owner Contact: Paul Bielen – (707) 524-1606

  • Construction Cost: $98,000 – 30 days

August 2006

Prep building pad, including import and compaction of engineered fill and site work for two relocatable buildings, foundation, underground electrical, connect to existing sewer and water systems.

  • For: Windsor School District

  • Owner Contact: Neil Bohn -Counterpoint Construction Services (707) 545-8440

  • Construction Cost: $127,390 – 30 days

June 2006

Interior renovations for 4500 sf classroom area, demo and reinstall all framing, sheetrock, doors, concrete flooring, insulation, complex plumbing in and under slab for Chemistry Lab; including underground acid tank and wash stations.

  • For: Roseland University Prep School

  • Owner Contact: Ken Coker, Coker Architects (707) 527-0880

  • Construction Cost: $598,000 – 90 day

May 2006

Renovate empty space to office use, metal framing, fire suppression system, sheetrock, insulation, paint, doors & windows, new kitchen, flooring and ADA bathrooms.

  • For: Tenant Improvements City of Healdsburg

  • Owner Contact: Scott Ward (707) 431-3348

  • Interior upgrades of unfinished office space

  • Construction Cost: $149,000 – 30 days

May 2006

Demolition removal and recycle of 381,000 gal reinforced concrete septic grinder, underground water supply and storm drain system, complex underground electrical system to various buildings at various depths, Fire suppression system.

  • For: City of Cloverdale Corporate Yard

  • Owner Contact: Ross Egge – (707) 894-1725

  • Construction Cost: $288,000 – 90 days

June 2005

Interior ADA and Fire Safety Upgrades interior fire doors, exterior automatic doors, new stairway area and concrete stairs, flooring, paint, sheetrock.

  • For: Stevenson Hall Sonoma State University

  • Owner Contact: Nora Hild (707) 664-2317

  • Construction Cost: $207,000 – 60 days

May 2005

Site work for Re locatable Buildings, excavation, off haul unsuitable soil, import and compact engineered fill to grade and prep new pad for relocatable building, underground electrical, storm drain; connect to existing sewer.

  • For: Steele Lane Elementary

  • Owner Contact: Jim Bohn Counterpoint Construction (707) 545-8400

  • Demo and Site work for new re locatable building

  • Construction Cost: $89,000 – 30 days

May 2005

Site work for relocatable Buildings.

  • For: Proctor Terrace Elementary

  • Owner Contact: Jim Bohn Counterpoint Construction (707) 545-8400

  • Demo and Site work for new relocatable building

  • Construction Cost: $120,000 – 30 days

August 2004

Demo and off haul existing security building, prepare site with underground utilities including modifications to storm sewer system, electrical, fire suppression, water and sewer. Install 2000 sf modular building and 1200 sf metal reinforced awning with 4ft x 10 x 6 ft footings.

  • For: Sonoma County Airport Security Screening Building

  • Owner Contact: Paul Bellomo (707) 688-2620

  • Construction Cost: $345,000

July 2004

ADA Upgrades Stevenson Hall.

  • For: Sonoma State University

  • Owner Contact: Chris Dinno (707) 664-2317

  • Exterior Upgrades

  • Construction Cost: $120,000 – 45 days

June 2004

ADA upgrades Traminer and Barbera Hall

  • For: Sonoma State University

  • Owner Contact: Norm Dickenson (707) 707-664- 2317

  • Exterior & Interior Upgrades to Student Housing

  • Construction Cost: $251,000 – 60 days

April 2004

New Anthropology Building and fire protection system, site preparation, grading, pad preparation including import and compaction of engineered fill for building pad, trench and install underground utilities, including electrical, fire suppression, water and gas. Stick frame and build 2000sf building including all interior finishes and systems.

  • For: Sonoma State University

  • Owner Contact: Norm Dickenson – (707) 707- 664-2317

  • New 2000 SF building

  • Construction Cost: $246,000

January 2004

Remodel existing warehouse into fully finished office space, including new ADA bathrooms, gas heating system, metal framing for interior office space, insulation, sheetrock, electrical work, doors, windows, paint. New underground fire suppressions system connected to the City water service Petaluma Blvd N in Petaluma, including all traffic control required by DOT.

  • City of Petaluma Transit Building Remodel

  • Owner Contact - Steve Castaldo (707) 778-4421

  • Construction Cost $ 291,910 – 45 days

November 2003

ADA Pathway at Veterans Building, demo existing 15000 ft asphalt parking lot, re grade with engineered fill to allow installation of new 5000 sf walkway between the cemetery and the facility, fine grading to assure ADA compliance throughout walkway.

  • For: Sonoma Veterans Building

  • Owner Contact: Sonoma County Architects office Barry Leduq (707) 565-1221

  • Construction Cost: $46,196 – 30 days

August 2003

Install Football Field and Track Path, grading and landscaping to create new football and track field, including import and grading of 1000 yards of engineered fill material, all grading to perfectly level field, fine grading and installation of landscaping and complex irrigation system.

  • For: Twin Hills Union School District

  • Owner Contact: Marlin Jones - RGM Associates, (707)824-7943

  • Construction Cost: $189,200 – 30 days